December 21, 2017
Congratulations to EVAPCO-BLCT as their project, Exelon's Wolf Hollow, was awarded Gas Project of the Year by the editors of Power Engineering and Renewable Energy World magazines. Built in Granbury, Texas, Exelon’s 1,000-MW Wolf Hollow gas-fired combined cycle plant began producing power in December 2016. The Wolf Hollow plant is one of two twin facilities designed and built in Texas for Exelon by Zachry Group. At the heart of this highly efficient plant is a 7ha.02 gas turbine from General Electric. The turbine is cooled with air instead of water, and according to GE, provides the most
December 12, 2017
EVAPCO is excited to announce the completion of our brand new Key Building. The new manufacturing facility is located across the street from our headquarters in Taneytown, Maryland. EVAPCO products are engineered and manufactured in 24 locations in 10 countries and supplied through a sales network of more than 170 offices. Take a look at the EVAPCO Key Building from start to finish in this time-lapse video . We can’t wait for the new year as production of our new eco-Air Series of products will be in full swing! Watch the video
December 8, 2017
EVAPCO is proud to be a part of this fantastic project with Johnson & Johnson. Watch the EVAPCO units roll in at the 2:19 mark. Installation by Flutec/Air Matrix with their Chil-Pak packages. Watch the video .